Leave Your Message
AI Helps Write
Project: Pilot's 836kWh C&I BESS Empowers High-Tech Industrial Park in Anhui, China
BESS Projects

Project: Pilot's 836kWh C&I BESS Empowers High-Tech Industrial Park in Anhui, China

content case Pilot’s 836kWh C&I BESS Empowers High-Tech Industrial Park
Project:Pilot’s 836kWh C&I BESS Empowers High-Tech Industrial Park in Anhui, China
Case:  Pilot’s BESS Drives Green Manufacturing: Peak-Valley Arbitrage & Carbon Reduction in Anhui
Product:Pilot PL-EL-250kW/836kWh
Address:China

A high-tech industrial park in Anhui has deployed Pilot’s 836kWh commercial and industrial energy storage system, one of our core modular solutions. Designed for flexible deployment, the system enabled seamless grid connection without requiring retrofits to the existing 400V distribution network, while supporting on-demand expansion to match the park’s growing production scale. By utilizing a peak-valley arbitrage mode—charging during low-cost off-peak nighttime hours and discharging during daytime peaks—the system achieves an annual discharge of over 5M kWh.

This intelligent scheduling and scalability not only drastically cut energy costs through price differentials but also significantly enhance the park's power security and stability. Beyond the economic gains, the project serves as a replicable model for zero-carbon transformation in manufacturing, reducing industrial emissions and helping the park meet global green trade standards for a dual economic and environmental win.

Learn more about BESS solutions: https://www.pilotech.ai/projects/

Related Products

Share this page:

More Projects

The Latest Press

View More Success Case Study, Contact Our Experts Today

Pilot Technology international sales team

  • 659e3b4ce95e036725
    • Tel:

      +86-756-6931888 ext 6088

    • WhatsApp:

      +44 7579 766578

  • 659e3b4d5aa6263010

    No. 88, innovation Eighth Road, Technology Innovation Coast, High-tech Zone, Zhuhai, China

  • 659e3b4c7bee980320

    marketing@pmac.com.cn

    AI Helps Write