Mali Hospital Solar Battery Energy Storage System

The system features seamless switching between grid-connected and off-grid modes. The switching is managed by the off-grid contactor in the energy storage cabinet's distribution box, with a switching time around 1 minutes. For applications requiring faster switching, an STS (Static Transfer Switch) can be installed to reduce the switching time.